Explore aggregate blends and a continuous finish for your Medway driveway. We discuss resin surfacing with the application system, support, traffic, edging and water route named in the proposal, separating an overlay from work that requires a new base.
Resin-bound construction mixes aggregate with binder before placement. Resin-bonded surfacing applies aggregate onto a resin layer. Ask which method is proposed and how it suits the intended use; the descriptions should not be exchanged in a quotation.
Permeability depends on the complete system beneath the visible finish. A porous surface needs compatible support and a suitable route for the water. Discuss the ground, outlet and construction rather than assuming an attractive aggregate blend establishes the drainage design.
Investigate the base before an overlay
Send photographs of the existing surface, including cracks, settlement, edges and pooling. An overlay needs retained construction that suits the proposed system. Ask what checks and repairs are included and how the final levels will meet doors and covers.
A new resin layer cannot automatically solve movement underneath it. Where excavation and new support are needed, compare those tasks with other driveway options. Advertised square-metre prices may assume a ready base and should not be treated as a complete price for reconstruction.
Choose the blend with a written product specification
Review samples outside beside the house and planned edging. Ask for the binder, aggregate blend and system requirements in writing, including suitability for vehicle use. UV characteristics, installation conditions and maintenance relate to the selected products.
Discuss what a later local repair or service excavation would involve. Matching an aged surface can be difficult. Clarify product and workmanship terms separately and keep the specification; an advertised lifespan from another supplier is not a guarantee for your driveway.
Compare total costs and ongoing care
Include removal, support, resin system, edges, covers, drainage, delivery and access when comparing resin with blocks. A lower visible-surface rate can omit work included elsewhere. Ask for optional items and exclusions to be clear before the installation is booked.
Sweeping and appropriate cleaning remain necessary. Follow the installed system’s instructions for equipment and treatments. The return to use depends on its curing requirements and actual conditions, with vehicle restrictions agreed at handover rather than borrowed from another project.
Confirm the resin product and installation scope
Request the proposed system, aggregate blend and binder specification in writing. Ask how the construction suits traffic and the existing or new base. Product suitability, UV characteristics and maintenance requirements should be established for the materials actually quoted, rather than inferred from an aggregate colour.
Discuss local repairs and future alterations, such as access to a buried service. Matching an older finish may be difficult. Keep the product details and handover so later care can follow the installed system. Where a quote retains a base, establish what checks and repairs are included before resin is laid.
What the complete Medway quotation should cover
Use the same agreed scope when comparing proposals. Confirm the materials and work below the visible finish, together with any retained construction. Ask how exclusions or provisional work will be handled and keep the written specification with the quotation.
Named resin-bound or resin-bonded system and intended use
Measured area, path extensions and aggregate blend
Retained-base checks, repairs or new supporting construction
Drainage through or away from the entire system
Edging, covers and transitions to other surfaces
Suitable installation conditions, curing handover, VAT and exclusions
Photographs, dimensions and access details help define the work. They can start the discussion, with a visit or further assessment where needed. A quoted total is useful when it is clear what the finished result includes.
From the first enquiry to handover
Assess the current entrance, support and levels.
Agree the system, aggregate sample, edges and water route.
Complete the specified preparation and supporting work.
Schedule and install the surface in suitable product conditions.
Receive written use restrictions and product-specific cleaning instructions.
Agree the programme after the scope and materials are confirmed. Include delivery arrangements, protection of retained features and any periods when the area cannot be used. At handover, confirm how the completed work should be used and cared for, and retain the relevant product details.
COMPLETED PROJECT · DEAL
Patio, composite deck and pergola
A sandstone patio, ash-coloured composite decking, pitched-roof pergola and sleeper planters.
This project is in Deal. The photographs show the documented work at that property.
The Deal garden includes a resin-bound centre within its patio. This is garden surfacing, not a documented resin driveway; vehicle use needs its own supporting specification.